Producing Energy In The Uinta Basin At present, the Uinta Basin is isolated from the national rail network. The existing transportation infrastructure consists of two-lane…
View Project
Improving the Quality of Life Green River has no existing natural gas lines. The proposed natural gas pipeline corridor (10-inch) traverses from the Greentown Plant…
View Project
Trail Blazing Recreational trail system between Flaming Gorge and Dinosaur Monument.
View Project
Increasing Public Safety Ridge Road has experienced deterioration due to the heavy volume of truck traffic. Deterioration of the road has caused public safety concerns…
View Project
Innovating the Energy Industry Education and research center located in Carbon County dedicated to studying the uses and benefits of thorium as a power source…
View Project
National Rail Network Connectivity A rail line between Moab, Utah, and Winslow, Arizona, with endpoints chosen as connections to the national rail system at each…
View Project
Bringing Rail To The Uinta Basin The concept of a rail from the Uinta Basin has been studied numerous times in recent decades (URS Engineers…
View Project